Optical Fiber Laying Projects:
Excavaton & Horizontal Drilling: Excavation of trench up to a nominal depth as specified, according to construction specifications along National/State Highways/other roads and also in city limits as per the customer’s requirement.
Laying of PLB: Laying of PLB pipes/coils coupled by PLB sockets in excavated trenches, on bridges and culverts as per Construction Specifications.
Optical Fiber Cable Pulling: Manholes marked during PLB pipes are excavated for pulling the cables. There may be situations where additional manholes are required to be excavated for some reasons, to facilitate smooth pulling of cable.
Manhole Installation and Commissioning:
OFC Blowing: We blow/de blow the cable in the PLB duct by air jet blowing as per the required Specifications.
Splicing & termination works: Splicing of all the fibres of OF Cable laid at every Joint within specified splicing loss range and making termination at the ends.
AMC / O&M work for existing laid optical fibers.